General Introduction
History
Presidents and Academicians
Organization
Dam Safety Management Center of MWR
Waterlocks Safety Management Center of MWR
Research Center for Climate Change of MWR
Engineering Quality Inspection Center of MWR
Hydrology and Water Resources Department
Hydraulic Engineering Department
River and Harbor Engineering Department
Geotechnical Engineering Department
Materials and Structural Engineering Department
Dam Safety Management Department
Center of Eco-Environmental Research
Research Center for Rural Water Management
State Key Laboratory of Hydrology-Water Resources and Hydraulic Engineering
Key Laboratory of Port, Waterway and Sedimentation Engineering of Ministry of Transport
Key Laboratory of Water Science and Hydraulic Engineering of MWR
Key Laboratory of Failure Mechanism and Safety Control Techniques of Earth-rock Dam of MWR
R&D Center of Hydro-Power Engineering Safety and Environmental Technology of NEA
International Joint Research Center of Water Science & Engineering
Research Center on Hydrology and Water Resources Engineering of MWR
Tiexinqiao Water Experiment Center
Chuzhou Water Experiment Center
Dangtu Water Experiment Center
River and Lake Research Center at Wuxi
MWR Public-Good Research Project “Preliminary Study on Floodwater Utilization of Danjiangkou and Major Control Reservoirs” Accepted
Post Time:2015-08-21Front:[ Large Medium Small ]

On Aug. 9, 2015, MWR Department of International Cooperation, Science and Technology (DICST) organized an acceptance meeting in Nanjing to assess the MWR public-good research project “Preliminary Study on Floodwater Utilization of Danjiangkou and Major Control Reservoirs” undertaken by NHRI. The expert panel consisted of experts withHohai University,Changjiang River Scientific Research Institute, Hai River Water Resources Commission,Sun Yat-sen University, CAS Nanjing Institute of Geography and Limnology, Huai River Water Resources Commission and Department of Water Resources in Jiangsu Province. After listening to the research results report, the expert panelunanimously agreed that the project had reached the expected research targets with comprehensive fulfilled research tasks, abundant research results and outstanding progress.

In view of the water source of the Middle Route of the South-to-North Water Diversion Project – the Han River Catchment, an assessment method of catchment floodwater utilization was constructed, and the floodwater utilization quantity and potential of the current situation and planning conditions were evaluated in the project.Schemes of stage control and dynamic control of limit water levelsand classified flood scheduling in the Danjiangkou, Ankang and Pankou Reservoirs were proposed.A multi-purpose comprehensive assessment model of floodwater utilization was constructed. Reservoir floodwater utilization risks and comprehensive benefits were quantitatively assessed.And the overall utilization strategy and risk control measures of catchment floodwater were put forward. The research findings have been applied in the survey and assessment of water resources in the Han River Catchment and operational scheduling of the Danjiangkou Reservoir, and have provided important technical support for the formulation of Water Allocation Scheme of the Han River Catchment, flood control and utilization capacity improvement of the Danjiankou Reservoir, and enhancement of its integrated water resources management.

ZHU Shoufeng, DICST director, DAI Jiqun, NHRI vice president and relevant colleagues with MWR Budget Execution Center and research team were present at the meeting.




打印本页 关闭窗口
Produced By 大汉网络 大汉版通发布系统